ONE FOCUSED ROUTE. END-TO-END SUPPORT.Guangzhou · Hong Kong
Products & services

Project & special cargo

Start with an individual handling review for machinery, oversized units, fragile goods or cargo with special transport requirements.

Plan this shipment
Service overview

Built around your shipment

Non-standard cargo where a standard parcel or pallet quotation misses lifting, packaging, acceptance or routing constraints.

What we confirm with you

A feasibility response with proposed handling scope and any outstanding approvals before a booking is accepted.

01 / Plan the right scope

The details that shape your plan

01

Build a technical cargo profile

Provide each unit’s dimensions, weight, centre of gravity, lifting points, photos and drawings; identify components shipped separately.

02

Review the whole physical route

Check factory exit, loading equipment, transport acceptance and destination access together. One feasible lifting point does not validate the entire journey.

03

Approve handling instructions

Define packaging, securing, orientation and handling limits before mobilizing equipment. Special cargo remains subject to explicit acceptance.

02 / How it works

From requirements to the next handoff

  1. 01

    Collect specifications and photographs

  2. 02

    Review packaging, lifting and acceptance

  3. 03

    Confirm route and specialist requirements

  4. 04

    Approve a shipment-specific operating plan

03 / Scope and cost items to confirm

A clear scope before a price

Preparation and packaging

Separate surveys, drawings, crating and securing from freight. Confirm who supplies materials and approves the final packing design.

Special equipment

Identify lifting, specialist vehicles and loading or unloading equipment at each end; verify their availability before fixing dates.

Changes and contingencies

Confirm standby, rescheduling and route-change treatment. A new dimension or cargo attribute may invalidate the original handling estimate.

Scope & availability

Inquiry and assessment only until written acceptance. Refrigeration, hazardous cargo and oversized equipment are not automatically accepted.

04 / When the plan changes

Handle changes with the right information

Actual unit differs from drawing

Pause the affected lifting or loading step, remeasure and obtain a revised plan before moving the unit.

Acceptance is conditional

List outstanding packaging, documentation or equipment conditions and obtain written closure before dispatching cargo to the terminal.

05 / FAQ

Service questions

Can you quote from weight alone?

Weight alone cannot define handling feasibility. Unit dimensions, lifting requirements and both locations are needed for a meaningful review.

Are batteries or dangerous goods automatically accepted?

No. Disclose the actual product and requested safety information first; dispatch requires the relevant carrier acceptance.

Can equipment be dismantled?

Ask the manufacturer to identify safe disassembly, packing and reassembly requirements; compare transport options using those approved specifications.

CHINA → ISRAEL

Your next shipment starts with a conversation.

Tell us what you are shipping. We’ll work out the next step together.

Chat on WhatsApp